Communications Control Center

Spain
  • Project start: December 2012
  • Project completion: June 2013
  • iGrid products involved: iControl – Control Center Edition
  • Number of RTUs/MV substations: Up to 130 facilities with 200 points/RTU
  • Number of data points: Up to 26000 I/O points
  • Protocols: IEC60870-5-104 and ModbusRTU
Description of the project:

iControl Control Center Edition was chosen as the SCADA system to supervise and control all the communication facilities (more than 100) of the customer (an important Spanish electrical utility), including radio base stations, communication links, UPS (Uninterruptible Power Supply) systems, and CERs (Communications Equipment Room).

All these facilities must be monitored constantly in order to ensure that all substations (HV and LV) are properly linked to the Control Centre at all time.

iControl communicates with radio base stations through IEC 60870-5-104. It also communicates with 900 sensors via modbusTCP, and with many network devices using SNMP.

The architecture used in this project is based on a SCADA server with 2-3 floating clients.

All projects, go to category:

Pole switchgear controller

Transparent IEC 60870-5-101 to IEC 60870-5-104 gateway

Transparent IEC 60870-5-101 to IEC 60870-5-104 gateway

PROCOME to IEC 61850 server gateway

PROCOME to IEC 61850 server gateway

Substation Automation System (India)

Substation Automation System (India)

Railway Low Power Substation (Middle East)

Railway Low Power Substation (Middle East)

Railway MV Substation (Middle East)

Railway MV Substation (Middle East)

Smart Metering for Generation Plants (Spain, Switzerland, Finland and Italy)

Smart Metering for Generation Plants (Spain, Switzerland, Finland and Italy)

MV Substation iRTU (Middle East)

MV Substation iRTU (Middle East)

MV grid automation RTUs (Argentina)

MV grid automation RTUs (Argentina)

MV grid automation RTUs (Spain)

MV grid automation RTUs (Spain)

Madrid Railway Network Energy Management (Spain)

Madrid Railway Network Energy Management (Spain)

Substation Automation System (Thailand)

Substation Automation System (Thailand)

IEC61850 Pilot Substation (India)

IEC61850 Pilot Substation (India)

IEC61850 Pilot Substation (Italy)

IEC61850 Pilot Substation (Italy)

Medium Voltage Grid Automation (Turkey)

Medium Voltage Grid Automation (Turkey)

Communications Control Center (Spain)

Communications Control Center (Spain)

Public Lighting Control Center (Spain)

Public Lighting Control Center (Spain)

Substation Automation System (Thailand)

Substation Automation System (Thailand)

Substation Automation System (Thailand)

Substation Automation System (Thailand)

Substation Automation SCADA (Thailand)

Substation Automation SCADA (Thailand)

High Voltage Substation DNP3.0 SCADA (Argentina)

High Voltage Substation DNP3.0 SCADA (Argentina)

Medium Voltage Grid Distribution Control Center (Spain)

Medium Voltage Grid Distribution Control Center (Spain)

Medium Voltage Grid Distribution Control Center (Argentina)

Medium Voltage Grid Distribution Control Center (Argentina)

High Voltage substation RTU (Middle East)

High Voltage substation RTU (Middle East)

High Voltage Substation RTU & SCADA (Middle East)

High Voltage Substation RTU & SCADA (Middle East)

We use cookies to ensure that we give you the best experience on our website. By continuing to use our website, you agree to our use of such cookies. You can change this and find out more by following: Cookie Policy. ACEPTAR

Aviso de cookies